Completed Projects

Precinct 1
1.01) Anderson Mill Rd.
1.02) Avery Ranch Blvd.
1.03) Lake Creek Drainage – Phase 1
1.04) Lake Creek Drainage – Phase 2
1.05) Lakeline Blvd.
1.06) McNeil Road – Phase 1
1.07) McNeil Road – Phase 2
1.08) Pond Springs Road at Turtle Rock Road Signal
1.09) RM 620 Feasibility Study
1.10) Wyoming Springs Drive North Study
1.11) RM 620 Interim Improvements – Phase 1
1.12) CR 111/Westinghouse Road
1.16) SE Inner Loop at FM 1460
1.17) Pond Springs Road
1.19) RM 620 Safety Improvements
1.20) Wyoming Springs Drive
1.24) RM 620/SH45 Pearson Ranch Underpass
1.25) King of Kings Crossing

Precinct 2
2.01) Vista Ridge Blvd.
2.02) Avery Ranch Blvd.
2.03) Brushy Creek Road
2.04) Cedar Hollow Road at SH 29
2.05) Cypress Creek Road
2.06) Lakeline Blvd.
2.07) River Bend Oaks Subdivision
2.08) Ronald W. Reagan Blvd. South – Phase 1
2.09) Ronald W. Reagan North – Phase 1
2.10) CR 175 (FM 1431 to Regional Park)
2.11) CR 185
2.12) CR 200 (CR 201 to Lackey Creek Road)
2.13) CR 214 (SH 29 to Rolling Hills Drive)
2.14) CR 258 (US 183 to Sunset Ridge)
2.15) SH 29 at FM 1869
2.16) Lakeline Blvd.
2.17) San Gabriel Parkway – Phase 1
2.18) US 183 Widening at CR 274
2.19) Ronald W. Reagan Blvd. South – Phase 2
2.20) Kauffman Loop
2.21) CR 175 Extension Phase 2A
2.26) SH 29 Improvements Study and Schematic
2.27) 183 (PTF)
2.28) CR 272
2.29) CR 273
2.34) Hero Way
2.35) US 183 at FM 3405 Signal
2.36) US 183 at FM 3405 Turn Lane
2.40) Lakeline Blvd Phase 2
2.45) Lakeline at 183
2.51) CR277
2.53) Cedar Park ILA Projects
P229) RM 1431 Gap Project
P331) Lakeline Blvd Right Turn Lanes
P271) Seward Junction Southeast

Precinct 3
3.01) Chandler Road – Phase 1
3.02) Georgetown Inner Loop East
3.03) Georgetown Inner Loop East Extension
3.04) Georgetown Inner Loop – Project 1
3.05) Georgetown Inner Loop – Project 2
3.06) Georgetown Inner Loop – Project 3 Study
3.07) Georgetown Inner Loop – Project 4 Study
3.08) Georgetown Inner Loop – Project 5 Study
3.09) CR 124
3.10) CR 142
3.11) CR 145
3.12) CR 152 Bridge Replacement
3.13) CR 157
3.14) CR 175
3.15) CR 234
3.16) CR 245
3.17) CR 311
3.18) CR 314
3.19) Wyoming Springs Drive North – Study
3.20) Ronald W. Reagan Blvd. South Phase 2
3.21) Ronald W. Reagan Blvd. North Phase 2
3.23) SH 29/CR 104 – Phase 1
3.22) IH-35 @ SH 29 Turnarounds (PTF)
3.26) CR 175 Extension Phase 2A
3.27) IH-35 Northbound Ramps
3.29) Ronald Reagan North Phase 4
3.30) RM 2338
3.31) SH 29 Improvements Study and Schematic
3.33) CR 175 Extension, Ph. 2 B
3.34) SH 195 Project 1
3.35) SH 29 @Park Place & Jack Nicholas

3.36) SH 195 Project 2
3.37) SH 195 Project 3
3.39) CR 245

Precinct 4
4.01) Bridge Replacements Phase 1 (CR 406, CR 390, CR 427)
4.02) Bridge Replacements Phase 2A (CR 424)
4.03) Chandler Road – Phase 1
4.04) CR 100
4.05) CR 112 – Phase 1
4.06) CR 119
4.07) CR 122 at US 79
4.08) CR 124
4.09) CR 132
4.10) CR 136
4.11) CR 137
4.12) CR 138 & CR 139 Alignment Study
4.13) CR 300 & CR 301
4.14) CR 302
4.15) CR 347 & CR 348
4.16) CR 368 & CR 369 (CR 101 to CR 366)
4.17) CR 404
4.18) CR 412
4.19) CR 466
4.20) FM 397 at SH 95 Signal
4.21) Gattis School Road ROW
4.22) Limmer Loop – Phase 1A
4.23) Thrall School Zone
4.24) US 79 – Section 1
4.25) US 79 – Section 2
4.26) US 79 – Section 3A
4.27) Chandler Road – Phase 2
4.29) CR 113/Old Settler's Blvd.
4.28) Limmer Loop – Phase 1B
4.30) Limmer Loop – Phase 1C
4.34) Chandler Road – Phase 1C
4.31) US 79 Section 5B
4.36) Gattis School Rd.

P263) Tradesman Boulevard Crossing
P297) East Williamson County Events Center Access Road
P319) Gattis School Road at Winterfield
P333) CR110 at University Boulevard