Road Bond Program
--
Author: Created: 1/13/2011 1:50 PM RssIcon
News on the Williamson County Road Bond
3/13/2017 10:35 AM
Construction crews are starting work improving I-35 at FM 3406 (Old Settlers Boulevard). The project will improve mobility, safety and connectivity for all modes of transportation along and across I-35. Click here for a project fact sheet and FAQ’s with more information, or you can visit the project website to learn more and to sign-up for construction alerts.
3/3/2017 10:37 AM

A groundbreaking for improvements to CR 110 South was held on Thursday, March 9, at 2 p.m. at Crosswalk Church, 8650 CR 110, Round Rock, TX. The project is from US 79 to Limmer Loop and is approximately 2.2 miles in length. The project will upgrade the existing two-lane roadway to a three-lane roadway (half of an ultimate six lane facility). The schematic design and Right-of-Way footprint consider the ultimate six-lane divided roadway typical section. The project was designed by Dannenbaum Engineers and the contractor is Chasco Constructors. The construction is anticipated to take approximately in 18 months. 

--