| Location |
Williams Drive from FM 3405 to D.B. Wood Road. |
| Description |
The design by KBR includes transitioning from a two-lane roadway to a four-lane roadway with a center two way left turn lane, grading, drainage improvements, asphalt paving, signage, signalization, and striping. This section has been removed from the State Highway System. |
| Status |
Construction began March 2009 and is expected to be completed by Fall 2010. |